Introduction
The landscape of electric vehicle (EV) charging is evolving, particularly in Australia, where the demand for accessible and efficient charging solutions is soaring. In a significant move, The Precast Forte Group has partnered with Macros Energy to introduce
EV Blocks, a precast foundation system designed specifically for EV chargers, into the Australian market. This partnership is poised to transform how contractors approach EV charger installations across the country.
What are EV Blocks?
EV Blocks are pre-engineered foundation systems that provide a stable base for both standard and DC EV chargers. This innovative solution not only streamlines the installation process but also eliminates common challenges such as weather-related delays. With a growing emphasis on sustainability and innovation in the transportation sector, EV Blocks represent a future-proof solution adaptable to a variety of settings.
The Strategic Partnership
As part of this new licensing agreement, Macros Energy will operate under the name
EV Blocks Australia. This venture opens new avenues for Australian contractors, offering them access to a proven product that has already garnered success in markets across the U.S., Canada, and parts of Europe.
David Ross and Colin McGregor, the leaders behind Macros Energy, recognized a burgeoning opportunity: the Australian government is actively providing financial incentives for businesses and municipalities to expand their EV infrastructure. Programs such as the Electric Vehicle (EV) Destination Charging Grant aim to increase the number of charging stations nationwide. However, despite these initiatives, contractors frequently encounter delays and additional costs tied to adverse site conditions.
A Solution for Contractors
Colin McGregor, Co-Founder of Macros Energy, highlighted the challenges faced by contractors when he mentioned a recent project impacted by inclement weather. "We began an EV charger installation on a cold, rainy day in Orange, and three days turned into a week. Contractors lose money before they've even begun a project. EV Blocks eliminate that problem, allowing contractors to stay on schedule and protect their margins," he explained.
With the integration of EV Blocks, contractors can adhere to project timelines more reliably and effectively manage their budgets. The simplicity of the installation means that projects can start without the risk of weather disruptions, providing a much-needed lifeline for construction timelines.
Supporting the Market
The Precast Forte Group is committed to ensuring the success of Macros Energy in delivering EV Blocks throughout Australia. Mike Klotthor, President of The Precast Forte Group, expressed the essence of their collaboration: "This is exactly the kind of partnership Forte was built for—connecting innovative solutions with the people who can bring them to new markets. With government grants accelerating EV charger installations, contractors need a reliable foundation solution that won't slow them down."
As a result, within weeks of their launch, Macros Energy has already started fulfilling orders for EV Blocks across various Australian locations, including multi-site petrol stations, wineries, and gardens eager to expand their EV charging capabilities. The company offers both DC charging bases and Standard Level 2 bases, with the latter being the most in-demand initially.
Looking Ahead
As EV adoption continues to grow, the EV Blocks initiative exemplifies the drive towards better preparedness for the future of transportation. With increased availability of charging infrastructure, it is imperative that solutions like EV Blocks are prioritized for ease of installation and reliability.
More than just a product, EV Blocks symbolize a shift in how Australia approaches electric mobility infrastructure—from a sporadic installation approach to a streamlined, efficient solution that meets the rising demands of the market. As Macros Energy leads this charge in Australia, their partnership with The Precast Forte Group reinforces the vital role that innovation and collaboration play in fostering sustainable infrastructure for the future of transportation.
About The Precast Forte Group
Founded in 2000, The Precast Forte Group is rooted in innovation within the precast concrete industry. Based in Coon Rapids, Minnesota, the company aims to lead in commerce and partnership, offering a comprehensive range of precast solutions. For more information, visit
www.precastforte.com.