New Power Meter Software
2026-05-26 04:35:25

Osaki Electric and Kandenko Launch New Software for Accurate Power Meter Wiring Assessment

New Software Enhancing Power Meter Installation Quality



Osaki Electric Industry Co., Ltd. has joined forces with Kandenko Co., Ltd. to develop a cutting-edge software solution aimed at ensuring the accuracy of wiring connections during power meter installations. This software has been specifically designed for contractors and system integrators working on power meter setups, facilitating a more efficient and reliable installation process.

Background on the Power Meter Market


Power meters are crucial devices that not only utility companies install in households and businesses but are also utilized by building owners to monitor tenant electricity usage in commercial spaces. Ensuring correct wiring during installation is imperative; inaccuracies can lead to erroneous billing and customer dissatisfaction. Given this context, there is an increasing demand for contractors who can guarantee precise and efficient wiring processes.

Overview of the New Software


Kandenko's innovative measurement support system, known as "BLuE," is installed on tablets to record data from various measuring instruments used in electrical installation. Historically, the installation records of power meters were managed through manual entry based on visual inspections, which could often lead to human error. However, by integrating the new software with Osaki’s Compact EM power meters, data can now be automatically recorded and reflected in real-time, effectively eliminating input errors and improving operational efficiency.

With the ability to automatically determine wiring accuracy, this new software enhances the overall quality management of installation services and ensures a uniform standard across various contractors.

How the System Works


1. A wiring check device applies a simulated load on the Compact EM to assess the state of the connections.
2. The Compact EM detects the load, and its data is immediately processed by the BLuE system, which outputs an instant verdict on the accuracy of the wiring, all viewable on a tablet.

Advantages of Implementing the New Software


  • - Immediate Verification: The capacity to confirm wiring accuracy on-site significantly reduces the risks of discovering wiring errors later in the installation process.
  • - Standardized Quality Control: By minimizing dependency on individual contractor experience, the software establishes a consistent quality benchmark for all installations.
  • - Digital Record Management: Integrating with BLuE allows for streamlined digital management of work records, making it easier to track results and ensure compliance, ultimately reducing administrative burdens.
  • - Mitigating Future Risks: By preventing erroneous billing due to miswiring, the software diminishes the liability risks contractors face related to potential compensation claims.

Company Profiles


Kandenko Co., Ltd.


  • - Headquarters: Minato City, Tokyo, Japan
  • - Established: 1944
  • - Core Business: Electrical, telecommunications, and air conditioning installation services
  • - Website: Kandenko Co., Ltd.

Osaki Electric Industry Co., Ltd.


  • - Headquarters: Shinagawa City, Tokyo
  • - Established: January 1937
  • - Core Business: Development and sales of power meters, distribution boards, monitoring control systems, and smart lock-related products
  • - Website: Osaki Electric

Through their collaboration, Osaki Electric and Kandenko are setting a new standard in the power meter installation industry, significantly enhancing operational efficiency, accuracy, and customer satisfaction.


画像1

画像2

画像3

画像4

画像5

画像6

画像7

画像8

画像9

画像10

画像11

画像12

画像13

画像14

Topics Consumer Products & Retail)

【About Using Articles】

You can freely use the title and article content by linking to the page where the article is posted.
※ Images cannot be used.

【About Links】

Links are free to use.