In a significant shift for the solar industry, recent updates to Treasury rules have provided an essential lifeline for solar developers across the United States. The elimination of the 5% spend test, coupled with the introduction of new requirements related to physical work, has allowed developers to maintain the eligibility of over 380 MW of projects under the GameChange Balance of System (BOS) solutions.
Overview of the Treasury Changes
The revised Safe Harbor guidance dictates that physical work must be completed by the end of this year for projects that utilize equipment classified as Foreign Entity of Concern (FEOC). For all other projects, an extended compliance window is granted from January 1 to July 4, 2026. This change is particularly critical as many solar projects await necessary utility, environmental, or local approvals prior to commencing construction. The implications of these restrictions could be substantial, creating hurdles for developers who rely on maintaining certain timelines to secure tax credits.
GameChange BOS Solutions Address Industry Challenges
Amidst these new requirements, GameChange BOS has stepped up to provide innovative solutions that ease the pressure on developers. By procuring GameChange BOS transformers, more than 75 solar projects are keeping their eligibility for the crucial 30% tax credit, significantly reducing overall project costs by $2-5 million. This financial relief is especially valuable when other factors delay onsite construction.
GameChange’s strategy centers around customizable transformers, which are essential components that can be tailored to meet the specific needs of each project. This customization process allows the manufacture of transformers to qualify under the physical work provision, even when the bulk of construction remains pending.
Sustaining Project Timelines and Financial Viability
Despite the changing regulatory landscape, GameChange’s offerings have enabled major progress within the portfolio. In the second quarter alone, GameChange BOS solutions helped secure safe harbor for 76 projects, amounting to over 380 MWdc of solar capacity. With an experienced team committed to timestamping and certifying all necessary work for IRS compliance, GameChange is equipped to handle an additional 250 projects this year and a staggering 600 projects in 2026.
Phil Vyhanek, President and COO of GameChange BOS, emphasized the urgent need for stability amid the evolving demands. “Especially with the additional start-of-work requirements, developers face uncertainty regarding financial predictability and viability,” he stated. “Having a BOS supplier like GameChange manufacture a customized solution creates a reliable, documented pathway to preserve tax credit eligibility and keep projects moving forward.”
A Comprehensive Portfolio for Future Projects
Beyond the innovative transformers, the GameChange BOS portfolio integrates seamlessly with their Genius Tracker™ systems. This holistic approach offers turnkey solutions that emphasize project flexibility, reduced risk, and superior long-term performance.
As solar energy continues to gain traction as a vital source of renewable energy, the combined efforts of the industry, regulatory bodies, and manufacturers like GameChange provide a promising outlook for the future of clean energy in the United States. GameChange BOS is dedicated not only to supporting developers in navigating these complexities but is also a steadfast partner in pushing for a greener future.
For more information, reach out to Claude Colp, CCO of GameChange BOS, at
[email protected].
About GameChange BOS:
GameChange BOS specializes in delivering Balance of Systems (BOS) solutions, including transformers for renewable energy applications. Through a commitment to research, development, and rigorous testing, they uphold the highest industry standards and drive efficiency in the market.