ZTE Enhances High-Efficiency AI Data Centers with Robust Energy Infrastructure

ZTE's Commitment to AI Data Centers



In the current wave of artificial intelligence (AI), computing power is evolving at an unprecedented rate, fundamentally altering various industries. However, sustaining this performance requires a stable and environmentally-friendly energy infrastructure behind every model training run and inference call. The demand for computing power isn't just skyrocketing; the energy consumption in data centers is also rising dramatically. Traditionally, data centers operated in the range of 10 to 20 kW per rack, but we are now witnessing the dawn of the AI Data Center (AIDC) era, where high-density GPU clusters are the norm, leading to rack power consumption quickly exceeding 100 kW and, in some cases, reaching 600 kW or even 1 MW.

This escalating demand exposes the shortcomings of conventional power supply architectures. The multi-stage conversion chain, from transformer to server, incurs significant losses, adding to operational costs each year. Furthermore, traditional air cooling systems struggle as cooling efficiency sharply declines beyond 20 to 30 kW per rack, forcing a shift towards liquid cooling solutions that ensure stable performance under full load. In essence, the competition in AIDC is no longer merely about computing power but has pivoted toward optimizing computational efficiency.

The Shift to Energy Efficiency



ZTE is tackling the challenge of maximizing energy efficiency through systematic approaches to rebuilding the energy foundations of AIDCs. One of their key innovations is the 800-V high-voltage direct current (HVDC) system, designed to combat power losses right from the source. This system incorporates efficient topology design, smart battery management, diverse application modes, and exceptional scalability, thus enabling a dense DC supply that is both highly efficient and environmentally friendly.

Moreover, intelligent management systems supporting full-link oversight and visibility enhance the performance of the entire setup. Capable of monitoring and simulating conditions at critical points, proactive maintenance covers module failures, system errors, and battery life, thereby simplifying operations and upkeep.

The 800-V system is adaptable, seamlessly switching between +400 V and 800 V standards, allowing upgrades without the usual initial investment strains. With capabilities tailored for both centralized large computing bases and distributed edge computing scenarios, ZTE addresses varied customer needs, encompassing operators, internet firms, and professional data center investors.

Advanced Liquid Cooling Solutions



As the energy supply becomes more efficient, cooling systems also require a comprehensive overhaul. ZTE has developed advanced liquid cooling units (LCU) that can deliver cooling capacities of 1.5 MW, which can be upgraded to 2.4 MW. Configurations can flexibly include two to five LCU racks, with optional modules scalable according to the company's growth. The use of integrated sensors for flow, pressure, and temperature ensures precise climate control, vital for high-density devices.

Safety features such as N+X redundant hot-backup solutions and dual power supplies facilitate uninterrupted operations. Together with the 800-V HVDC system, these innovations create a seamless exchange channel for energy input and cooling output, maintaining a power usage effectiveness (PUE) score lower than 1.15—a benchmark for efficient operations.

Practical Applications and Success Stories



A prime example of ZTE's innovations in action is at the Nanjing Binjiang data center, which showcased its modernization efforts by implementing integrated liquid cooling combined with high-efficiency HVDC distribution. Operating at optimal parameters with a PUE score of just 1.15, this project exemplifies the effectiveness of ZTE's solutions.

Recently, ZTE, in partnership with local players, successfully launched the Karakoram-01, Pakistan's inaugural AI-capable data center complex, leveraging advanced technologies for both cooling and power supply, thus offering scalable and adaptable infrastructure fit for AI applications.

Conclusion



Traditionally, data centers planned for computing power, energy supply, cooling, and maintenance separately. However, the soaring computational density in the AIDC era allows weaknesses at any point in this chain to manifest exponentially. ZTE's solution involves harmonizing the planning and management of these interconnected systems from the outset of a project. By promoting a comprehensive approach that combines computation, supply, and cooling, ZTE effectively enhances efficiency, reduces costs, and fosters environmentally friendly development.

As ZTE continues to innovate and produce flagship products like the 800-V HVDC system and liquid-cooled LCUs, the company is poised to convert its energy advantages into competitive capabilities in the realm of AI-powered computing.

For further information about ZTE and its contributions to sustainable computing infrastructures, please visit ZTE's official site.

Topics Consumer Technology)

【About Using Articles】

You can freely use the title and article content by linking to the page where the article is posted.
※ Images cannot be used.

【About Links】

Links are free to use.