Completion Ceremony for Shiroyama Water Purification Plant Renovation
On March 30, 2023, Watering Engineering Co., part of the Watering Group, attended the completion ceremony for the major renovation of the Shiroyama Water Purification Plant in Joetsu City. The event underscored the company's commitment to enhancing local water infrastructure and was attended by local government officials, including Joetsu City Mayor Junichi Kosuge and various stakeholders from the community.
During the ceremony, Watering Engineering received a letter of appreciation from Kazunobu Takahashi, the project manager from the Joetsu Gas Waterworks Bureau. This recognition highlights the collaborative efforts that characterized the renovation project, a testament to the importance of public-private partnerships in urban infrastructure development.
Background of the Project
The Shiroyama Water Purification Plant serves as the largest water supply facility in Joetsu City, providing drinking water to approximately 60% of the city’s residents prior to its merger. Since its completion in 1968, the plant has faced challenges of aging and operational demand, prompting the Joetsu Gas Waterworks Bureau to initiate a significant renovation in the fiscal year 2021. The project utilized a Design-Build delivery system to streamline construction, and after a thorough selection process, Watering Engineering, in partnership with Tanaka Industries, was chosen to carry out the project.
Facility Overview
- - Name: Shiroyama Water Purification Plant
- - Location: Joetsu City, Hazutsuka 920
- - Water Source: River Water
- - Distribution Capacity: 40,000 cubic meters per day
- - Treatment Method: High-speed coagulation and sedimentation, rapid filtration
- - Operational Start Date: March 1969
Project Details
- - Delivery Method: Design-Build
- - Contractor: Watering Engineering & Tanaka Industries Joint Venture
- - Project Cost: 5.678 billion yen
- - Construction Period: March 25, 2022 - March 15, 2026
Key Aspects of the Renovation
The renovation includes several noteworthy points:
- - The maximum supply capacity has been reduced from 51,000 cubic meters to 40,000 cubic meters per day, reflecting an anticipated decline in water demand due to population decreases.
- - To save on costs, existing civil structures were preserved while new plant equipment, electrical systems for central monitoring, and support structures were repaired and upgraded.
- - Collaboration with local company Tanaka Industries enriched the project, reinforcing community ties and support for local businesses.
Attendance at the Ceremony
Approximately 30 individuals, including city council members, local residents, and representatives from regional and specialized media, gathered to celebrate the milestone. The atmosphere was one of community pride and optimism as the renovation promises to bolster the city’s water infrastructure for future generations.
Commitment to Safe and Sustainable Infrastructure
Watering Group remains dedicated to supporting the sustainable development of local water infrastructure. By executing construction projects with a focus on safety and reliability, the company aims to contribute to a safer and healthier community. The enhanced capabilities of the newly renovated Shiroyama Water Purification Plant reflect Watering Group’s mission to provide quality water solutions while addressing the challenges of urban living.
For further details, you may visit the
Joetsu Gas Waterworks Bureau website.
About Watering Group
Watering Group is dedicated to its mission of contributing to society through water, the essence of life. With a comprehensive approach that includes the design, construction, operation, and maintenance of water treatment facilities, the company strives to meet the growing needs of communities across Japan, operating around 300 facilities nationwide. The brand message, “Create the Future of Water,” encapsulates its vision for a sustainable water environment that supports both daily life and the urban landscape.