Analysis of the Home Renovation Peak Period
Home renovation has become increasingly important as people look to improve their living environments, especially during the peak demand season from September to November. A recent survey conducted by Zehitomo, a matching service for various sectors, explored the renovation trends and waiting times experienced during this busy period. The findings reveal that approximately 60% of surveyed contractors have faced waiting times, and demand has notably concentrated on areas such as water facilities, roofs, and exterior walls.
Background and Purpose of the Survey
Zehitomo aimed to understand the current state of renovation requests and the waiting periods that arise during the traditional busy season from September to November. The survey was conducted among registered contractors on the platform to uncover trends and issues related to renovation services during these months.
Survey Details:
- - Method: Online questionnaire
- - Participants: Renovation contractors registered with Zehitomo
- - Valid responses: 371 samples
- - Survey duration: August 27, 2025 - September 3, 2025
The questionnaire included the following key inquiries:
1. Do waiting times for construction tend to occur in September-November?
2. Is there an extension in the construction period during this time?
3. Which month sees the most concentration of renovation requests?
4. What are the primary causes of waiting times or lengthy construction periods in September-November?
5. Which renovation areas receive the highest demand during this time?
Summary of Results
- - Approximately 60% of contractors reported experiencing waiting times during the September-November period, indicating a significant demand surge.
- - About 70% stated that the construction period remains consistent with other periods, with only a minority experiencing significant delays.
- - The peak months for requests vary but tend to concentrate in October and November.
- - The resurgence in requests is influenced by multiple factors, such as end-of-year demands, responses to natural disasters, and deadlines for subsidies and grants.
- - The most requested renovation area is prominently the “water facilities,” followed by “roofs” and “exterior walls.”
The findings suggest that, while the peak time presents some waiting and slight construction delays, the degree of disruption is relatively limited. The demand appears to be somewhat spread out but leans towards October and November, reflecting the need to prepare for year-end requirements and address natural disaster damage.
Detailed Insights by Questionnaire
1. Do contractors experience waiting times in September-November?
- - About 60% confirmed that waiting times are common during this period, with nearly 40% indicating that minimal delays occur. However, only about 3% reported significant delays, suggesting that although waiting is prevalent, it may not necessarily lead to major issues for most contractors.
2. Is the construction period longer in September-November?
- - Approximately 69% of contractors said that construction times remained consistent, revealing that significant changes in periods are uncommon, while over 20% acknowledged minor delays due to increased demands.
3. Which month sees the most concentration of renovation requests?
- - The majority of contractors indicated that requests do not concentrate in any specific month, although there are tendencies for October and November to attract more requests as the year comes to a close.
4. What causes waiting times or longer construction periods?
- - The principal reason stated was the increase in demands due to year-end preparations, with over half attributing it to a desire to enhance living conditions before the new year. Further, a significant portion attributed the demand to responses to natural disasters.
5. Which renovation areas receive the most requests?
- - “Water facilities” emerged as the most requested area, indicating a high demand for comfort and utility enhancements, followed closely by “roofs” and “exterior walls,” reflecting a growing emphasis on durability and safety.
Conclusion
The survey confirms that the September-November period is indeed a high-demand season for the renovation industry, with some waiting times and minor delays occurring, but significant disruptions remain manageable. The core motivations for these requests stem from preparing homes for the new year and addressing any urgent repairs due to climate-related events. This analysis provides critical insights, suggesting that contractors must develop strategies to handle peak demands while consumers should consider early consultations to manage their renovation timelines effectively.
For those looking to renovate, Zehitomo offers an easy way to find the right contractors to suit your needs. Addressing repairs promptly, especially for critical areas like water facilities and exterior work, can prevent further costs down the road. With no hassle consultation processes, getting started is simple and beneficial.
Contact Zehitomo for a renovation estimate today!