Envision Energy Partners with Kallista for 386-MWh Energy Storage Project in France

In a significant step towards advancing renewable energy infrastructure, Envision Energy, a global leader in green technologies, has partnered with Kallista Energy, a European renewable energy producer, to implement a 386 MWh battery energy storage system (BESS) in Neuilly-en-Thelle, located in the Hauts-de-France region of France. This ambitious project marks a pivotal development in their ongoing collaboration, aiming to foster a robust and sustainable energy transition.

Construction began in early July 2026, with plans to operationalize the BESS by Spring 2028. This initiative builds upon the success of Envision Energy's first BESS project, the Saleux project, which commenced construction in 2025. The Neuilly-en-Thelle project not only strengthens the partnership between Envision and Kallista but also establishes a scalable framework for expanding energy storage capabilities across Europe.

Envision Energy is set to provide its advanced BESS solution and oversee the project throughout its life cycle, ranging from onsite maintenance to battery recycling after 25 years of operation. The system will utilize lithium iron phosphate (LFP) cells produced at Envision AESC's 10 GWh gigafactory in the Hauts-de-France region. This local production aspect facilitates system integration, enhancing regional industrial capacities and bolstering the resilience of the energy infrastructure in the area.

Once operational, the storage system will deliver essential flexibility services to the French grid, including frequency regulation via RTE’s reserve markets, which will assist in balancing supply and demand within the electricity network. With a capacity sufficient to meet the daily demand of 30,000 households, the project is positioned to significantly enhance grid stability, support increased integration of renewable energy sources, and aid in the ongoing electrification efforts across France.

Mr. Henry Peng, Senior Vice President of Envision Energy and President of the EU & LATAM Regions, commented on the partnership, stating, "Our second BESS project with Kallista Energy reflects the continued growth of a collaboration grounded in shared goals for the energy transition in Europe. Envision not only provides safe, reliable, and scalable storage technology but also offers comprehensive support throughout the project lifecycle, helping clients maximize the long-term value of their assets. This integrated approach propels our future energy system forward, enhances grid stability, accelerates the integration of renewable energies, and supports sustainable industrial development across Europe."

Johann Tardy, CEO of the Kallista Energy Group, emphasized the critical role of battery storage in achieving a carbon-neutral economy, adding, "For the Neuilly-en-Thelle battery energy storage system, we leverage the close collaboration established with Envision Energy during our previous project in Saleux to create a new, high-quality storage infrastructure that further propels the energy transition.

The Neuilly-en-Thelle project is more than just a significant engineering operation; it embodies a commitment to a sustainable future, driving the adoption of renewable energy technologies and positioning Europe as a leader in energy innovation. This cooperation between Envision Energy and Kallista Energy not only highlights the advancements in green technology but also represents a vital stride towards meeting Europe’s ambitious climate goals. Through initiatives like these, both companies are playing a crucial role in shaping an interconnected, efficient, and sustainable energy landscape that can support the increasing demand for clean energy solutions, ultimately contributing to a more sustainable planet.

Topics Energy)

【About Using Articles】

You can freely use the title and article content by linking to the page where the article is posted.
※ Images cannot be used.

【About Links】

Links are free to use.