Construction of New Logistics Facility in Nagoya
Nippon Steel Kowa Real Estate Inc., headquartered in Minato, Tokyo, has officially started construction on the third facility in the LOGIFRONT series within the Chubu region, named "(tentative) LOGIFRONT Nagoya Moriyama II". This new logistics hub is set to be completed by January 2027.
Strategic Location
Situated within the vibrant city limits of Nagoya, which boasts a population of over 2 million, this facility is strategically placed to facilitate deliveries to major consumer districts, catering to last-mile logistics for surrounding residential areas including Moriyama. Additionally, the site is located approximately 5km from the Katsukawa Interchange on the Nagoya Second Ring Road, making it ideally positioned for both regional and citywide logistics operations.
Commuting is convenient as well, with access to the JR Chuo Main Line taking just 16 minutes from Nagoya Station to Shin-Moriyama Station, from where the facility is a mere 14-minute walk away. This accessibility serves as a key advantage in attracting and retaining a skilled workforce.
Facility Design
The architectural design of LOGIFRONT Nagoya Moriyama II harmonizes with the adjacent LOGIFRONT Nagoya Moriyama, adopting a monochromatic aesthetic that ensures a cohesive visual identity in the area. This facility is designed to optimize urban delivery operations with efficiency at its core. It will feature a total of 30 loading spaces on both the east and west sides, along with large vehicle berths and multiple vehicle entry points to enhance delivery efficiency.
To ensure the safety of both employees and visitors, a dedicated separation of delivery and visitor pathways is planned. Office spaces, rest areas, and meeting rooms will be provided to ensure a comfortable working environment for employees.
Commitment to Sustainability
In alignment with sustainable development goals, the facility will incorporate innovative materials, including the GX steel "NSCarbolex® Neutral" produced by Nippon Steel Corporation. This collaboration aims to reduce CO2 emissions by about 8% from steel production to the construction phase, enhancing the overall environmental compatibility of the facility.
The company is committed to its "Think Sustainable" philosophy, continually striving to meet environmental considerations across its logistics facilities. Initiatives previously include the installation of solar panels and full LED lighting systems, successfully achieving an A-rank in the CASBEE (Comprehensive Assessment System for Built Environment Efficiency) for new constructions. As environmental concerns rise, the collaboration with Nippon Steel on NSCarbolex® represents a stepping stone towards ongoing innovation and sustainable practices in logistics facility development.
Diverse Industrial Real Estate Endeavors
Nippon Steel Kowa Real Estate operates on a broader scale, engaging not only in the LOGIFRONT logistics facilities but also in adjacent sectors such as residential, R&D, manufacturing, and various types of storage and industrial sites. The company has launched a new brand, 01-LabFactory, aimed at developing and managing rental R&D facilities and factories by 2025.
By catering to diverse business needs and expanding its footprint in the logistics and industrial property markets, the company is poised for sustained growth and successful exploration of quality business opportunities both domestically and internationally.
Conclusion
LOGIFRONT serves as a forefront infrastructure series making strides to adapt to the evolving supply chain and online commerce sectors. As they continue to innovate modern logistics solutions, collaboration with clients to uncover new business opportunities remains a priority for Nippon Steel Kowa Real Estate.
Overview of Facility Specifications
- - Name: (tentative) LOGIFRONT Nagoya Moriyama II
- - Location: 3 Chome-1812, 1815, 1816, 1817 Koshin, Moriyama Ward, Nagoya, Aichi Prefecture
- - Access: Approximately 5km from Katsukawa Interchange on the Nagoya Second Ring Road, 14-minute walk from JR Chuo Main Line Shin-Moriyama Station
- - Site Area: 4,903.14 m² (1,483.19 tsubo)
- - Floor Area: 1,685.05 m² (509.72 tsubo)
- - Structure: Steel construction, 2-story building
- - Design and Construction: Nippon Kokudo Development Co., Ltd.
- - Schedule: Construction began in August 2026, completion expected in January 2027.