Cospa Power Cube Up
2026-08-14 05:57:54

Launch of Cospa Power Cube Up: A New Service for High Voltage Equipment Management

New Service Announcement: Cospa Power Cube Up



Off-Grid Lab, a group company of Fiber Gate, is excited to announce the launch of its service, "Cospa Power Cube Up," starting September 2026. This service will be provided in collaboration with Energy Connect, offering management and transfer of ownership of high voltage receiving equipment known as cubicles.

Background and Objectives


Currently, a staggering 65% of the cubicles installed domestically have surpassed the recommended 15-year renewal period, which has become a critical challenge due to their deteriorating condition. The degradation of these facilities poses a serious risk not only to the facilities themselves but also to the surrounding areas, potentially leading to power outages or ripple accidents. Such incidents could result in substantial compensation costs or even business halts.

In addition, compliance with safety management laws regarding electricity and unexpected repair expenses that can reach millions pose significant burdens on operators. Through the Cospa Power Cube Up service, Off-Grid Lab aims to mitigate these business risks while promoting energy autonomy based on local production and consumption. This initiative will support the adoption of renewable energy, including solar power and storage batteries, facilitating the development of a next-generation energy infrastructure anchored in local communities.

Overview and Features of Cospa Power Cube Up


Cospa Power Cube Up allows customers to transfer ownership and installation responsibilities of their current cubicles to Energy Connect, along with maintenance, repair, and management services. The service includes the following three benefits:

1. Zero Initial Costs and Repair Cost Stabilization
Customers can utilize the service without any initial costs, paying a monthly fee based on a secure 15-year contract. Repair and replacement costs for parts falling within the service scope are included in the monthly fee. This alleviates the burden of unexpected repair expenses due to aging equipment and contributes to stabilizing cash flow.

2. Risk Off-Balance Sheet via Ownership Transfer
By transferring ownership and installation responsibilities, customers can reduce the operational burden and risks associated with high voltage receiving equipment, such as ripple accidents. This approach allows for smoother operations while minimizing anxiety over potential mishaps.

3. Seamless Transition Utilizing Existing Equipment
Users can transition to the service while retaining their current cubicles. This service also lessens the burden associated with selecting and coordinating contractors during malfunctions, leading to a stress-free operational experience. Additionally, customers can benefit from proposals that combine energy cost-saving measures offered through the group's high voltage power service, Cospa Power.

Smart and Resilient Future


The Cospa Power service utilizes a market-linked pricing plan, enabling customers to save on electricity costs by strategically using energy during cheaper rates. This initiative not only addresses equipment aging risks for our clients but also fosters the development of smarter and more resilient building environments through enhanced infrastructure.

As part of our new slogan "Lead The 'Telecomenergy'," we are committed to leading the upgrade of essential societal infrastructures.

About Fiber Gate


  • - CEO: Masanori Inomata
  • - Head Office: 8-10-3 Minami 1-jo Nishi, Chuo Ward, Sapporo, Hokkaido, 060-0061
  • - Founded: September 2000
  • - Securities Code: 9450 (Tokyo Standard/ Sapporo Stock Exchange)
  • - Business Areas: Home use, business use, renewable energy (electricity), real estate, and more.
  • - Website: Fiber Gate

About Off-Grid Lab


  • - CEO: Masanori Inomata
  • - Location: 2-10-12 Shiba Daimon, Minato Ward, Tokyo, 105-0012
  • - Founded: July 2021
  • - Business Areas: Renewable Energy initiatives as part of the Fiber Gate Group.
  • - Website: Off-Grid Lab

About Energy Connect Co., Ltd.


  • - CEO: Junpei Kondo
  • - Location: 1-4-10 Nishi Ikebukuro, Toshima Ward, Tokyo, 171-0021
  • - Founded: March 2025
  • - Business Areas: Acquisition, safety management, and management of high voltage receiving equipment.
  • - Website: Energy Connect

Contact Information for This Service


Off-Grid Lab


画像1

画像2

Topics Consumer Technology)

【About Using Articles】

You can freely use the title and article content by linking to the page where the article is posted.
※ Images cannot be used.

【About Links】

Links are free to use.